|
Coal Harbour Marina Vancouver, B.C., Canada Construction Cost: $3 million Completion Date: 1997 |
|
|
|
|
|
This 230 slip marina is located in downtown Vancouver. The firm was responsible for the floating concrete moorage system, a floating concrete wave attenuator, a 39 ft x 56 ft floating concrete platform for a two-story building, all piling layout and structural design.
|