Error message

  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).

Tensile Membrane

When it first opened in 1983 with its air-supported roof, BC Place was not only the first domed stadium in Canada but also the largest roof of its kind in the world. Decades later in 2011 the revitalized BC Place Stadium reopened after a dramatic transformation, the key...

Geiger Engineers was the engineer for the design/build roof replacement at the Dedmon Center, a multipurpose athletic and recreation field house on the Radford University campus. The original air-supported roof over the 50,000 sq ft (4,645 sq m) field house was...

Pages