Error message

  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).
  • Warning: Illegal string offset 'field' in DatabaseCondition->__clone() (line 1895 of /home2/geiger/public_html/includes/database/query.inc).

Theater & Entertainment

Zoo Miami engaged Geiger Engineers to design a roof canopy as part of the significant renovation of their Sami Family Amphitheater. The roof canopy covers the venue's seating which can accommodate over 800 spectators. The semi-circular canopy is comprised of a deep...

Geiger Engineers provided the structural design and analysis for NBC's Million Second Quiz outdoor set in New York City. The 55 ft (17 m) tall by 80 ft (24 m) diameter television game show set, temporary seating terraces, lighting towers and ancillary...

The Lyric Theater's concrete slab stage apron was demolished and replaced with stage lifts for the production of Spider-Man: Turn Off The Dark. Once the show finished its Broadway run, the production was required by contract to return the theater to its pre-show...

The Lyric Theater's ceiling and proscenium plaster restoration, after Spider-Man: Turn Off The Dark ended its Broadway run, required a work platform. Other restoration work needed to proceed at stage level which precluded erecting scaffolding for the plaster work. The...

Kenny G and Charmin partnered for an outdoor event on the Hard Rock Cafe's marquee in Times Square. The Hard Rock is located in the historic Paramount Theater building and the original marquee is part of the Cafe's property. Over the years, Geiger has reviewed and...

The LEGO X-Wing Fighter, newest addition to LEGOLAND in California and the world's largest LEGO sculpture, was first revealed in Times Square on May 22, 2013. Geiger Engineers designed the winch drive system, the tracks, and the base pads for evenly distributing the...

Geiger Engineers continues to work on numerous indoor and outdoor special events from hotel ballroom and arena rigging to temporary outdoor advertising installations and music festivals. Rigging layouts and environmental loads (for outdoor events) are evaluated,...

Geiger Engineers was engaged to analyze and design removable banners for the Smithsonian National Museum of American History. The 15' wide by 40' tall outdoor banners flank the museum entrance off of the National Mall and promote the Smithsonian's newest exhibit. The...

Canada Place (formerly Canada Harbour Place), claimed to be the most photographed building in Canada, is a mixed-use complex built on a pier in Vancouver's harbor for the 1986 World Exposition. A key element of the complex's unique architecture is the sculptural tensile...

Geiger Engineers is the structural Engineer of Record for the design-build specialty contractor of this free-form stage canopy structure over an outdoor stage at Shell Place in MacDonald Island Park. The 30m (98 ft) wide canopy spans 75m (246 ft.)

Pages