Tropicana Field New Roof

St. Petersburg, Florida, USA — 2025

Geiger Engineers served as the Engineer of Record for the replacement of the tensioned fabric roof at Tropicana Field, home of MLB's Tampa Bay Rays in St. Petersburg, Florida. The stadium is covered by a 688-foot-diameter Geiger Cabledome covering approximately 353,000 square feet. Following Hurricane Milton in October 2024, winds exceeding 100 mph damaged 18 of the roof's 24 fabric membrane panels.

A new tensioned fabric membrane roof was designed, fabricated, and installed as part of a design-build project for the City of St. Petersburg. The replacement roof consists of twenty-four PTFE-coated fiberglass panels, each measuring approximately 15,240 square feet. From design and permitting through fabrication and installation, the entire roof replacement was completed in just 10 months, allowing the facility to reopen for the 2026 baseball season.

Geiger Engineers provided engineering for the replacement roof system as well as construction-stage tensioning analysis and support. The completed roof restored one of the world's largest cable-supported domed structures and returned Tropicana Field to service in time to host the Tampa Bay Rays during the 2026 season including the World Series.

Client
City of St. Petersburg
Cost
$15 Million